It depends on project size and the use of stock or non-stock colors
There are three different project categories in terms of lead time.
- 10 lockers or fewer
- Stock colors
- Standard locker size
2) Standard Lead Time (6-8 weeks)
- Above 10 lockers
- Stock colors
- Standard locker sizes
3) Extended Lead Time (12-14 weeks)
- For non-stock colors
- Or locker designs that are custom
All lead times start after we've received purchase order, signed shop drawing, and any applicable deposits